How to write a quote for an EV charger installation (with a real worked example)
Last winter a sparky I know in Bristol quoted £850 for a 7kW home charger, one line on a WhatsApp: "EV charger, supply and fit". The customer's consumer unit was full, the garage was 18 metres from it across a paved drive, and the supply turned out to be PME with no way to hit a decent earth electrode reading. None of that was on the quote. The earth rod, the extra metres of armoured cable and a new RCBO board took the cost to nearly £1,300, and he ate the difference.
The charger was the easy part. The quote never said what the cable run was, what the earthing would need, or who paid when the survey was wrong. This guide shows how to write an EV charger quote so those answers are on paper before the first hole goes in the wall.
TL;DR
- Survey the consumer unit, the supply, the earthing type and the cable route before you price. Photograph all four.
- Name the charger, the cable, the protective device and the mounting. "EV charger" is not a specification.
- Put the earthing method, certification and DNO notification on the quote as lines, not afterthoughts.
- Use a provisional sum for trenching, core drilling and a new consumer unit, and write the exclusions plainly.
- Take a deposit that covers the unit, with the balance on the day you commission and hand over the certificate.
Survey before you price anything
Ten minutes on site saves an argument later. Four things go in your notes before a number goes on paper.
- The supply and the consumer unit. Single or three phase, the main fuse rating, how much spare capacity there is, and whether the board has a free way. Look at what else is on it: electric shower, hob, heat pump. A 7kW charger draws 32A for hours, and a house with big loads may need a load management device or a supply upgrade.
- The earthing arrangement. Most UK homes are TN-C-S (PME). Under BS 7671 Section 722 that means either a charger with built-in open-PEN protection or an earth electrode with a reading that works. If the customer has a TT supply, the picture changes again.
- The cable route. Measure from the consumer unit to the charger position, not from the front door. Note the wall type, whether it is internal or external, any drive or patio to cross, and any cavity or solid wall to drill.
- The mounting position. Charger on the house wall, a garage wall or a post. Weather exposure, distance to the car's charging port, and whether the cable needs to reach both sides of the drive.
Photograph the consumer unit with the cover off, the meter and cut-out, and the route. When the customer says "you never said the board was full", you have the picture.
Then ask three questions that move the price: which charger (tethered or untethered, with or without solar integration), whether it needs to be smart, and whether anyone has told the network operator already. Write the answers on the quote.
Split the quote the way the job runs
One lump sum is quick to write and hard to defend. Break it into lines the customer can follow.
- Charger. Make, model, power rating, tethered or untethered, and the earthing feature it includes.
- Cable and containment. Cable type and size (6mm² or 10mm² SWA, depending on the run and the design), glands, clips or conduit, and the length you measured plus a margin.
- Protective devices. The Type A RCBO (or RCD arrangement) with DC fault detection if the charger does not provide it, and any enclosure or isolator.
- Consumer unit work. Nil, one way added, or a new board. This line is the one that moves the job most, so keep it separate.
- Labour. Days and number of people, not a vague "labour".
- Testing, certification and notification. The Electrical Installation Certificate, the Building Regulations notification through your scheme, and telling the DNO.
Put the cable length on the quote as a number. A customer who sees "12m of 6mm² SWA" doesn't ask why you want more money when the garage turns out to be 18 metres away. If you want a refresher on turning day rates into a price, how to price a trade job covers it.
A worked example: 7kW charger on a driveway wall
Adam Wójcik trading as Wójcik Electrical is pricing a 7kW untethered smart charger on the side wall of a 1990s semi. The consumer unit is in the hall with one spare way, the supply is single-phase PME, and the cable runs 12 metres through the hall wall and along the outside of the house, surface-clipped. The charger has built-in open-PEN protection, so no earth rod. One electrician for a day and a labourer for half of it.
- 7kW untethered smart charger with open-PEN protection: £420
- 6mm² 3-core SWA cable, 12m plus 2m spare at £8 a metre: £112
- Glands, clips, fixings, sealant: £45
- 32A Type A RCBO and enclosure: £60
- Isolator and small items: £30
- Labour, 1.5 person-days at £250: £375
- Testing, certificate and scheme notification: £60
- Van, consumables and DNO notification time: £35
- Subtotal: £1,137
- Contingency and profit at 10%: £113.70
- Quote, rounded: £1,250 before VAT
If Adam is VAT registered, VAT at 20% adds £250, so the customer sees £1,500. Installing a charge point is standard rated as far as I know, but check the current rules on gov.uk before you put it in writing for a customer. Grants for home chargers have changed more than once, so don't promise one unless you have checked what applies to that customer on gov.uk.
Quoted the Bristol way, at £850, the same job leaves the electrician short before anything goes wrong. Here the risk lines are visible: the cable length, the RCBO, the test and notification. If the customer wants it cheaper, take out the smart features or move the charger closer to the board. Don't cut the certification.
Exclusions, provisional sums and the supply
Write what is outside the price, in plain English.
- A new consumer unit, if the existing one has no spare way or fails inspection. Price it as a separate line once you have opened the board.
- Trenching, core drilling through solid walls beyond the first, and making good brickwork or paving.
- An earth electrode and the testing to prove it, if the charger needs one and the soil will not give a decent reading.
- A supply upgrade or load management, if the main fuse cannot take it. That is the network operator's call, not yours.
- Anything the customer adds after acceptance, such as a second charger or a longer run, priced in writing before you start.
Then add a provisional sum for what you cannot see. Something like: "Price assumes an accessible consumer unit with one spare way, a surface-mounted cable route of up to 14m and a charger with built-in open-PEN protection. If the survey assumptions are wrong, extra work is charged at £250 a day plus materials at cost, agreed in writing before we carry on."
Add one line on the network. Tell the customer you notify the DNO, that you notify Building Control through your competent person scheme, and that the customer gets an Electrical Installation Certificate on the day you commission. If you are not scheme registered, say who notifies and who pays the fee. The detail on the scheme side is in the Part P self-certification guide.
Get the Get-Paid Pack, free
Four quote forms, an invoice, T&Cs, a variation order and a job sign-off form, ready for a job like this one. Replaces around £400 of solicitor-drafted templates. No card needed.
Download instantly on the next page. Written by someone who has spent years in the UK construction field.
Payment stages that match the job
A charger install is a one-day job with a chunk of the cost in the unit and cable, so two payments are plenty. On the £1,250 example:
- £625 (50%) on acceptance, to order the charger and cover the cable and protective gear.
- £625 (50%) on completion, after you have tested, commissioned and handed over the certificate.
Put the percentages and the triggers on the quote. How much is fair to ask upfront is in the guide on deposits, and the thinking behind staging larger jobs is in stage payments for trades. Send the final invoice the same day you finish, while the charger is still showing green in the driveway.
What NOT to do
- Don't quote a flat price per charger. A figure that ignores the cable run, the board and the earthing is a guess with a number on it.
- Don't skip the earthing check. On a PME supply the earthing method is a design decision under BS 7671 Section 722, and the cheapest answer is the one you find out on day one, not after the customer's car is plugged in.
- Don't leave the charger off the specification. Name the make, model and rating, so a substitution is a decision and not an accident.
- Don't forget the paperwork. Certificate, Building Control notification and the DNO step belong on the quote with a price against them, or you will do them for free.
- Don't absorb a new consumer unit into the price. If the board is full or fails inspection, it is a separate quoted line, agreed before you change it.
The short version
Look at the board, the supply, the earthing and the route before you price. Put the charger, the cable, the protective device, the labour and the certification on separate lines, with the cable length shown. Use a provisional sum for what you cannot see, write the exclusions in plain English, and take a deposit that covers the unit. That leaves fewer reasons for an argument on the driveway.
Frequently asked questions
How much does it cost to install an EV charger in the UK?
It depends on the cable run, the consumer unit and the earthing arrangement. The worked example, a 7kW untethered smart charger with a 12 metre cable run to a driveway wall, comes to £1,250 before VAT including the unit, cable, protective device, labour and certification. Price your own job from your own survey, not from a headline figure.
Is EV charger installation notifiable under Part P?
Yes. A new circuit for a charge point in a dwelling in England is notifiable under Part P of the Building Regulations. If you are registered with a competent person scheme you self-certify and the scheme notifies Building Control. If you are not, you notify the local authority before you start. Scotland and Northern Ireland have their own rules.
Do I need to tell the distribution network operator about a home charger?
Usually yes. The DNO expects to be told about a new charge point connection, commonly within 28 days of commissioning for a standard single-phase 7kW unit, and before you start if the supply is weak or the property already has other large loads. Check the current route with your scheme or the DNO, and put the step on the quote.
What earthing does an EV charger need?
BS 7671 Section 722 sets the rules for charge points. On a TN-C-S (PME) supply, which is most UK homes, you either use a charger with built-in open-PEN protection or install a suitable earth electrode. A site where the soil cannot give a decent electrode reading is the one that changes your price, so test before you quote.
How long does an EV charger installation take?
A simple install with an accessible consumer unit and a short external run is around one working day for an electrician with a labourer for part of it. Longer runs, trenching, a new consumer unit or a difficult wall can take two days. The worked example allows 1.5 person-days.